A lithium battery pack needs a precharge path whenever the load presents significant DC-link capacitance. Without one, an uncharged capacitor bank draws an uncontrolled surge at the instant the main contactor closes. Contacts can weld, the DC bus can sag far enough to reset other modules, and the connector can be damaged by the initial current peak. The fix is a controlled precharge stage that raises the load-side voltage to a defined threshold before the main contactor is allowed to close, with a current limit, a timeout and a logged fault if the target is never reached. This article sets out how to specify that stage, how to size it, and what evidence to request from a pack supplier.

Why a capacitive load draws a surge
Motor drives, inverters, DC-DC converters and distributed I/O all place electrolytic or film capacitance across their DC input. At the moment of connection those capacitors look like a short circuit. Two relationships govern the event. The current into a capacitor is I = C x dV/dt, so a fast voltage step demands a large current; the energy that must be moved into the capacitor is E = 0.5 x C x V^2. The peak current in an uncontrolled connection is set by the total series resistance of the loop: cell internal resistance, cell interconnects, harness, contactor resistance, capacitor ESR and connector contact resistance. A low-resistance lithium pack is precisely the kind of source that can deliver a very high peak.
An Analog Devices discussion of hot-swap design describes the same mechanism in rack electronics: each module can present capacitance of the order of millifarads, and if inrush is not limited the terminal voltage can drop enough to reset adjacent modules while the connectors are damaged by the initial current. In a battery-powered machine the consequence is broader than a reset. A welded main contactor removes the pack’s ability to disconnect on an overcurrent or a BMS fault; a sagging bus can corrupt a controller power-up; repeated surge events erode contact plating. The mechanical rating of the pack connector and the make/break rating of the contactor should therefore be reviewed together with the precharge design, not separately.
A worked example with assumed values, not a measurement: a 48 V pack feeding 10 mF of input capacitance stores 0.5 x 0.010 F x (48 V)^2 = 11.52 J at full charge. If the total loop resistance is 20 mOhm, the initial current from Ohm’s law is 48 V / 0.020 Ohm = 2400 A. Those two numbers explain why the limiting element has to absorb a defined energy and why the switching device needs a defined pulse rating. Both are calculations from the stated assumed inputs, and both must be redone with measured values from the actual load before a specification is issued.
Define the inputs before choosing a topology
Precharge is an interface function, which means it cannot be specified from the battery datasheet alone. The pack maker needs the load-side capacitance, the load’s allowed voltage ramp, the system’s maximum pack voltage at the relevant state of charge and temperature, and the behaviour required on a failed precharge. Buyers who skip this step tend to receive a pack with a fixed resistor and no way to coordinate with the machine controller. The table below is the minimum input set we recommend putting into the interface specification.
| Input | Unit / condition | Why it drives the design | How to obtain it |
|---|---|---|---|
| Maximum pack voltage at connection | V DC at full charge and at the lowest specified operating temperature | Sets the worst-case I = V / R and the energy 0.5 x C x V^2 | Cell datasheet plus the number of series cells; confirm with a bench measurement |
| Load-side capacitance | F, measured with the load unpowered, including cabling and any EMI capacitors | Sets total charge and precharge time | Measure with an LCR meter at the pack connector; include the inverter DC-link value from its datasheet |
| Allowed inrush current | A peak, with a stated duration | Sets the limiting resistance or the MOSFET current limit | Load supplier rating plus contactor and connector make ratings |
| Target precharge time | s, at the minimum operating temperature | Sets resistor pulse energy and the BMS timeout | System power-up budget; define separately for cold start and hot restart |
| Close threshold | V DC differential between load side and pack, or percent of pack voltage | Limits the second surge when the main contactor closes | Agreed between pack maker and system integrator; record in the interface spec |
| Fault behaviour | Timeout, retry count, log entry, contactor state | Prevents repeated stress on a shorted or over-capacitive load | System safety concept; align with the BMS communication interface fault flags |
| Contactor and connector ratings | A make current, A break current, number of operations | Confirms the parts survive the residual surge at main close | Component datasheets; derate for temperature |
| Load profile context | A continuous, A peak, duty cycle | Separates steady current from the one-off connection event | See the load-profile sizing method |
Three ways to limit the current
Three topologies cover most industrial packs. A resistor in series with a small relay or a dedicated precharge contactor is the usual arrangement in higher-voltage systems: the BMS closes the precharge branch first, waits for the load voltage to rise, then closes the main contactor and opens the precharge branch. An NTC thermistor is a compact low-cost option for small loads; its resistance starts high and falls as it self-heats. An active MOSFET stage, of the type described in the hot-swap literature, controls the gate so that current follows a defined ramp or stays below a set limit.
| Topology | Current control | Hot-restart behaviour | Energy / protection detail | Where it fits |
|---|---|---|---|---|
| Resistor plus precharge relay or contactor | Fixed, set by R and pack voltage; current falls as the capacitor charges | Consistent; resistance is essentially independent of recent use | Resistor needs a pulse energy rating and a temperature rating; BMS supervises timeout | Industrial packs, AGV drive buses, ESS racks, any load with large DC-link capacitance |
| NTC thermistor | Self-limiting, but the initial resistance depends on the thermistor’s own temperature | Weak: after a recent run the part is still hot, so the next connection sees less limiting | Low part count, but the residual resistance adds a continuous loss in the main path unless bypassed | Small, low-energy loads that are not reconnected quickly |
| Active MOSFET / hot-swap stage | Programmable current limit or controlled dV/dt ramp | Consistent, provided the controller and sense path are powered | MOSFET safe operating area (SOA) must cover V, I and pulse duration; a timer limits overcurrent duration | Lower-voltage systems, hot-plug modules, designs needing a logged current profile |
The comparison is deliberately qualitative. Component values, SOA curves and ratings are device-specific and must come from the selected part’s datasheet. What matters contractually is that the supplier states which topology is used, gives the control parameters, and agrees the acceptance test that proves them. An NTC design that is acceptable for a handheld instrument can be the wrong choice for an AGV that reconnects its pack several times per shift.
Sizing the limiting element
For a resistive stage, the initial current is approximately I_initial = V_pack / (R_pre + R_loop), where R_loop is the remaining series resistance. The resistor must absorb the charging energy, 0.5 x C x V_pack^2, over the precharge interval; the average power is that energy divided by the allowed time, and the peak power at t = 0 is I_initial^2 x R_pre. Both numbers need to be checked against the resistor’s pulse-load curve at the minimum ambient temperature, with a derating margin set by the OEM. A resistor that survives a single cold start in the laboratory can still fail after repeated starts in a warm enclosure.
For a MOSFET stage, the same energy is dissipated in the silicon. The manufacturer’s SOA graph relates drain-source voltage, drain current and the time the die can withstand that dissipation. The design check is therefore a point on that graph, not a single current number. The Analog Devices article referenced above shows the method: estimate the energy in the load capacitance, divide by the limited power to obtain the start-up interval, then confirm the SOA curve covers that interval. A timer that cuts off an incomplete precharge protects both the transistor and the pack.
Two boundary conditions are regularly missed. First, the close threshold. If the main contactor closes while a large differential remains, the resulting second surge is governed by the same physics as the first connection; the close threshold must be written into the interface specification and measured, not left to a fixed delay. Second, the hot restart. A load that was disconnected and reconnected quickly may still hold charge, so the precharge logic should measure the load-side voltage rather than assume it is zero. In both cases the BMS needs a voltage measurement on the load side of the contactor, or an equivalent signal from the machine controller.
Control sequence and acceptance evidence
A defensible sequence is short and explicit: verify that the main contactor is open and the BMS has no active fault; read the load-side voltage; close the precharge branch; monitor the rise and enforce a timeout; when the measured differential reaches the agreed threshold, close the main contactor and open the precharge branch; log the event. On timeout, abort, keep the main contactor open, set a fault flag and require a defined reset condition. The automotive EOL testing literature documents that power battery packs commonly use separate main positive, main negative and pre-charge relays, and that relay performance is an explicit item in end-of-line electrical testing; a study of online EOL test strategy for EV power batteries describes that relay set and its test coverage. Custom industrial packs do not need the same architecture, but they do need the same discipline: the precharge function is a testable function, not an assumed one.
Ask for the evidence in the delivery dossier. The table below is a practical request list; the acceptance column should be filled with the OEM’s own limits before the RFQ is issued, because generic limits copied from another project are not valid evidence.
| Test | Method | Record to request | Typical acceptance basis |
|---|---|---|---|
| Peak inrush current | Current probe on the pack output during a cold connection at maximum pack voltage | Oscillogram with probe scale, V, A and time axes | At or below the current limit in the interface spec |
| Precharge interval | Same capture, measured from branch close to main contactor close | Time in s at the stated temperature | Within the specified time budget at the minimum operating temperature |
| Close differential | Differential voltage measurement across the main contactor immediately before close | V DC value and the threshold it is compared against | At or below the agreed close threshold |
| Timeout fault | Connect an oversized capacitive or shorted test load | Fault flag, log entry, contactor state, retry behaviour | Main contactor stays open; fault is logged; no automatic unlimited retry |
| Hot restart | Disconnect and reconnect within the shortest specified interval | Load-side voltage at reconnect and the resulting current trace | No uncontrolled surge and no nuisance fault |
| Component stress | Resistor pulse energy or MOSFET SOA check against measured traces | Calculation with measured V, I, t and the part datasheet reference | Within the published rating with the agreed derating |
| Interface with the machine | System-level power-up with the real inverter or drive installed | Commissioning record signed by the integrator | No bus sag, no controller reset, no contactor welding |
Where standards fit, and where they do not
IEC 62619:2022 sets safety requirements for secondary lithium cells and batteries in industrial applications, covering stationary uses such as telecom, UPS and energy storage as well as motive uses such as forklift trucks and automated guided vehicles. That scope is relevant to the pack itself. Precharge, however, is a function of the boundary between the pack and the equipment it feeds, so its limits usually come from the system integrator’s interface specification and, where machinery rules apply, from the equipment-level standard such as IEC 60204-1 for the electrical equipment of machines. Treat the two documents as complementary: the pack standard addresses battery safety, while the machine standard addresses the electrical installation that receives the DC bus.
Do not assume that a certification report for a cell or a pack covers the precharge function. It normally does not. The evidence that matters is the interface specification, the schematic or functional description of the limiting stage, the SOA or pulse-energy calculation, and the bench traces from a connection at the defined worst case. If a supplier cannot produce those four items, the pack may still be compliant as a battery, but the system integration is unverified.
What to put in the RFQ
State the load capacitance, the maximum pack voltage, the allowed inrush current, the close threshold, the precharge time budget at the minimum operating temperature, the required fault behaviour and the evidence list above. Ask which topology is proposed and why it was chosen for the reconnect pattern of your product. Ask for the measured traces on a representative unit rather than a calculated value alone. These are ordinary engineering questions, and a supplier that builds custom packs for industrial and robotic equipment should be able to answer them with documents rather than adjectives. If you need the interface definition reviewed against a real load profile, send the load data and the connection sequence and we will work through the inputs with your team. Our custom pack engineering scope covers the BMS, contactor and harness decisions that sit around this interface.