For a battery pack above 60 V DC, hipot and insulation resistance testing verify that no unintended conductive path exists between the live DC circuit and accessible conductive parts such as the enclosure or the protective bonding circuit. The acceptance limits normally come from the standard that governs the end equipment, not from the pack datasheet: IEC 60204-1 for machinery and IEC 60601-1 for medical electrical equipment are two common sources. The critical practical rule is to isolate the BMS and other voltage-sensitive electronics before applying a dielectric test voltage, and to test the cell stack indirectly through the pack terminals with the contactors open. This article explains what each test measures, how to define the test points, and what a complete test record looks like.

Two different tests, two different questions
An insulation resistance test applies a defined DC voltage and measures the resulting resistance, typically in MOhm. It is a quantitative, generally non-destructive measurement: a falling value points to moisture, contamination, a pinched harness or degraded insulation. A dielectric strength test, often called a hipot test, applies a higher AC or DC voltage for a defined dwell time and checks that no breakdown occurs, often with a leakage-current trip. It is a pass/fail stress test, and repeating it at full voltage can age insulation that was otherwise sound.
| Aspect | Insulation resistance test | Dielectric strength (hipot) test |
|---|---|---|
| Question answered | How resistive is the insulation path, in MOhm, at a stated test voltage? | Does the insulation withstand a stated voltage for a stated time without breakdown? |
| Typical source | DC, for example 500 V DC in the machinery verification clause | AC at 50 Hz or 60 Hz, or DC where the governing standard permits it |
| Measured quantity | Resistance computed from applied voltage and leakage current | Leakage current during the dwell, plus a breakdown indication |
| Failure criterion | Resistance below the specified minimum | Breakdown, or leakage above the trip setting |
| Effect on electronics | Can still stress semiconductors; disconnect them or use a limited test voltage | High risk to BMS boards, TVS diodes and EMI capacitors unless isolated |
| Where it is used | Production verification, incoming checks, field diagnostics | Type testing and production verification where the product standard requires it |
The distinction matters because a buyer who asks for “a hipot report” without defining the test point, the voltage, the dwell and the disconnected components can receive a document that proves very little. A report that states only “passed” is not evidence of a defined test.
Where the 60 V DC boundary and the limits come from
Sixty volts DC is a recurring boundary in electrical safety work rather than a single universal definition. In IEC 60204-1, for example, the residual-voltage requirement calls for any part that remains above 60 V after supply disconnection to discharge to 60 V or less within 5 s. Above that region, the consequences of an insulation fault change, so verification tests become part of the equipment safety case.
For machinery, IEC 60204-1:2016 clause 18 describes the verification tests for the electrical equipment of a machine. The insulation resistance test in clause 18.3 is commonly summarised as 500 V DC applied between the power circuit conductors and the protective bonding circuit, with a minimum of 1 MOhm; the dielectric strength test in clause 18.4 uses a test voltage of twice the rated supply voltage or 1000 V, whichever is greater, applied for at least 1 s at 50 Hz or 60 Hz, with no breakdown discharge. Several independent test-laboratory summaries of the standard give these same values, and the IEC webstore page for the standard confirms its scope: electrical, electronic and programmable electronic equipment of machines, starting at the point where the supply connects to the machine.
Three cautions follow from that wording. First, the test voltage is applied between the live circuit and the protective bonding circuit, not across the cells. Second, the standard’s own verification practice allows components that cannot withstand the test voltage to be disconnected during the test. Third, these are equipment-level limits. IEC 62619:2022, the pack-level safety standard for industrial lithium batteries covering stationary applications such as UPS and energy storage and motive applications such as forklifts and AGVs, addresses battery safety; it does not replace the equipment-level acceptance criteria. A buyer should map both documents and then state which one supplies the acceptance number for a given test point.
For medical equipment, IEC 60601-1 applies to the medical electrical equipment as a whole, and its dielectric strength and creepage/clearance requirements are evaluated at device level. A battery pack inside such a device is one part of that insulation system, which is why the pack supplier and the device manufacturer must agree the test boundary early. For unearthed DC systems, IEC 61557-8:2014 covers insulation monitoring devices that permanently monitor insulation resistance to earth in IT systems, including unearthed DC IT systems with voltages up to 1500 V DC. That is a monitoring standard, not a production hipot method, but it is useful when the pack feeds a floating DC bus in an ESS or an industrial installation.
Define the device under test before applying any voltage
Most disputes about hipot results come from an undefined boundary. A pack contains a cell stack, contactors, a BMS with sensing leads, current shunts, communication transceivers, EMI capacitors and often TVS protection at the connector. Applying a kilovolt-class test across a live BMS will destroy components or produce a false failure through the suppression devices. The test specification must therefore say what is connected, what is tied together, what is open and what is removed.
A workable arrangement for a pack-level check is: open the main contactors or use the service disconnect so the cell stack is electrically isolated from the output terminals; tie the pack output terminals together; disconnect or isolate the BMS electronics and any surge suppression that cannot withstand the test voltage; apply the test voltage between the tied terminal node and the enclosure or protective bonding point. Never apply the test voltage between pack positive and pack negative, and never apply it across cells. After the test, discharge the DUT through a defined path and verify that no residual charge remains before reconnection.
| Test point | What is tied / open | Components to isolate | Failure modes it detects |
|---|---|---|---|
| Output terminals (tied) to enclosure or PE | Contactors open; cell stack isolated; positive and negative output tied | BMS board, CAN/SMBus transceivers, TVS diodes, Y capacitors | Damaged harness insulation, pinched leads, creepage short, conductive contamination |
| Output terminals (tied) to communication connector shell | Same as above; comm port left unpowered | Transceiver ICs, optocouplers, ESD protection arrays | Isolation barrier failure between power and data interfaces |
| Charge port to enclosure | Charge path contactor open; pack output isolated | Charge-control electronics, reverse-polarity protection | Charger inlet insulation damage, moisture ingress at the inlet |
| Enclosure to protective bonding point | All power circuits de-energised | None; this is a continuity check, not a hipot test | Missing or high-resistance bond that would invalidate the other measurements |
| Sense harness to enclosure | Cell stack disconnected from BMS sense inputs | ADC inputs, filter capacitors | Chafed sense wires touching a metal case |
The continuity check in the fourth row should come first. An insulation measurement referenced to a bonding point is meaningless if that bond is not sound. This ordering also mirrors the sequence suggested in test-laboratory guidance on IEC 60204-1 verification: confirm protective bonding, measure insulation resistance, then perform the dielectric test. Reversing the order can stress a fault that a continuity check would have caught with no high voltage at all.
The record that makes a result usable
A test result without its conditions cannot be compared across production lots, after a design change, or after a field return. The record should allow another engineer to reproduce the measurement exactly. Note that the numbers in the table below are illustrative field names and units, not universal limits; the applicable voltage, dwell and leakage limit must come from the governing product standard and the OEM specification.
| Record field | Unit or format | Why it is required |
|---|---|---|
| DUT identification | Serial number, hardware revision, BOM revision | Ties the result to a specific configuration |
| Test point definition | Schematic reference, tied/open nodes, isolated components | Removes ambiguity about what was stressed |
| Applied voltage and source type | V DC or V AC with frequency in Hz | DC and AC results are not interchangeable |
| Ramp and dwell time | s | Leakage depends on how long the voltage is held |
| Measured leakage or resistance | microamp or MOhm, with instrument range | Gives a trendable number rather than a bare pass |
| Acceptance limit and its source | Limit value plus standard clause or spec reference | Shows which rule the result is judged against |
| Ambient conditions | degrees C and relative humidity in percent | Moisture strongly affects insulation readings |
| Pack state | State of charge in percent, contactor state, time since last charge | Defines the electrical state of the DUT |
| Instrument identity | Model, serial number, calibration due date | Supports audit and measurement traceability |
| Result and disposition | Pass/fail, operator, date in UTC, retest count | Controls repeated exposure to full test voltage |
Production, incoming inspection and field retesting
Decide at which stage each test is performed and how often. A full dielectric strength test on every unit can be appropriate where the product standard requires it, but repeating it at incoming inspection and again after installation adds stress without adding information. Many buyers instead require the production test record from the supplier, then perform a lower-stress insulation resistance check at receiving and compare it against the supplier’s value. That approach fits an incoming inspection plan, where the goal is to detect changes in transit or handling rather than re-run a type test.
Correlate the results with other evidence. A unit that passes hipot but fails an EMC immunity check may have a layout or grounding problem that the dielectric test does not reveal. A unit with a history of thermal events deserves a different investigation, as covered in our article on thermal runaway propagation testing. And a falling insulation resistance in the field is often a moisture or contamination story, not a cell defect, so the enclosure sealing and harness routing should be inspected before the pack is condemned.
Common failure causes are worth listing explicitly in the troubleshooting guide: condensation after a cold-to-warm move, cleaning fluid residue on a connector, a sense wire trapped under a cover screw, a damaged conformal coating, a wrong connector with reduced creepage, and a TVS diode left in circuit that clamps the test voltage. Each produces a different leakage signature. A record that includes the measured value, not just pass/fail, helps separate them.
What to ask a pack supplier for
Request the test specification with the test point diagram, the governing standard clause for the limit, the list of disconnected components, a sample production record with all fields populated, and the instrument calibration evidence. Ask how many times a unit may be subjected to the full test voltage and what is done after a failed test. Ask whether the pack’s BMS is designed to be isolated during the test or whether an alternative DC insulation method is used. These questions are a normal part of a certification and evidence review, and they can be answered without disclosing any proprietary cell data.
If you are defining an acceptance test for a pack above 60 V DC, share the equipment standard that applies to your product along with the pack’s intended earthing arrangement. The test voltage, the test points and the isolation plan all follow from those two facts, and getting them into the RFQ is cheaper than discovering the mismatch at final acceptance.


